Wrapped Stairs – Antwerpen-Centraal – Urban Media

€12.771 / 21 days*

*Exclusive technical cost, production and taxes

1 panel/screen

  • 1

    6m2

Network information
OpenClose

Network information

Stickered stairs in the main hall of railway station Antwerpen-Centraal. These stairs connect the platforms 0 and -1.

Budget year: 2026

Media ownerBAUER MEDIA OUTDOOR – URBAN MEDIA_BE
Budget€12.771
Taxes€20
Duration21 days
AvailabiltyFrom 29/12/2025 till 27/12/2026
Contacts 12+1.740.069

Get a quote

I want to advertise on:
Wrapped Stairs – Antwerpen-Centraal – Urban Media

"*" indicates required fields

DD slash MM slash YYYY