JCD Airport “BRU” – Connector Arrival 2

€21.600 / 28 days*

*Exclusive technical cost, production and taxes

1 panel/screen

  • 1

    16m2

Network information
OpenClose

Network information

Prime visibility on the way towards the baggage reclaim.
Highly powerful reaching 100% of the Schengen arrivals

Budget year: 2025

Media ownerJCDecaux
Budget€21.600
Duration28 days
AvailabiltyFrom 01/01/2025 till 31/12/2025

Get a quote

I want to advertise on:
JCD Airport “BRU” – Connector Arrival 2

"*" indicates required fields

DD slash MM slash YYYY